Tank Construction Repairs and Coatings
Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program with input from the DLA SRM Group. The initial statement of work included base repairs and upgrades to each tank to comply with current UFC 3-460-01 and AST Standards where they applied. As each tank was inspected, the scope was revised to include additional repairs needed to bring the tanks into compliance.
Repair work completed under the Task Order includes:
- Tank bottom replacement
- Cathodic Protection installation
- Installation of flexible membrane liners for secondary containment
- Installation of high/low level alarms
- Tank coatings and linings
Related Projects
Related News
Streamline and simplify your next project using the Design-Build delivery process
On many construction projects, design-build delivery offers significant advantages over more traditional delivery systems including shorter construction, lower costs, continuous and unified quality control and reduced risk for the project owner. A study conducted by...
The unique challenges of bringing Industrial Solutions to life
Manufacturing is an economic engine that thrives on ingenuity and planning. Pond’s industrial team supports a variety of different industrial customers with a variety of different services. From engineering to construction, planning to line replacements, warehousing...
Innovative Technologies Reduce Cost & Improve Facility Performance
When you were 8 years old and had a month’s worth of allowance saved up from completing all your chores, did you have a hard time figuring out how to spend it? You may have found yourself in a toy or candy store having difficulty deciding, but it did not take longer...