Arc Flash studies at the Oakland air traffic control center consisted of two separate reports, the air traffic control center and a separate office park located on site. There are 1,016 points of interest within the Air Traffic Control Center model. The data...
The Guam site consisted of 218 points of interest, and a week on-site. The building model consisted of six scenarios involving two generators, two separate UPS, and transfer switches located at each individual critical panel. The facility is fed with a 1,000A, 480V...
The Atlanta Air Traffic Control Center included four separate reports, one for each facility located within the property. The initial site visit was completed in September 2016 and the reports were completed in April 2017. Pond spent two weeks on site collecting data...
As part of an ongoing program, Leidos Innovations Corporation (Leidos) is supporting the Federal Aviation Administration (FAA) under the National Airspace System (NAS) Integration Support Contract (NISC-III). Leidos serves as Program Manager to provide Power Study and...