Tank Construction Repairs and Coatings
Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program with input from the DLA SRM Group. The initial statement of work included base repairs and upgrades to each tank to comply with current UFC 3-460-01 and AST Standards where they applied. As each tank was inspected, the scope was revised to include additional repairs needed to bring the tanks into compliance.
Repair work completed under the Task Order includes:
- Tank bottom replacement
- Cathodic Protection installation
- Installation of flexible membrane liners for secondary containment
- Installation of high/low level alarms
- Tank coatings and linings
Related Projects
Related News
Pond Engineers and Architects to assist with Inspections
Keep your Projects Moving Forward We understand the importance of keeping your construction projects moving forward. That’s why Pond stands ready with our experienced and licensed Engineers and Architects to assist with inspections in accordance with Official Code of...
Pond Recognized by American Council of Engineering Companies of Georgia with the Engineering Excellence State Award
ATLANTA – (12.12.2019) – Pond, an industry leader in engineering, construction, architecture and planning services, is proud to be named a 2020 American Council of Engineering Companies of Georgia (ACEC Georgia) Engineering Excellence State Award winner for the work...
Pond enlists industry leader to strengthen EPCM Oil and Gas Program
ATLANTA – (12.13.18) – Pond, an industry leader in engineering, construction, planning and architecture services, is pleased to announce the addition of Emily Rech as Program Manager for the firm’s Engineering, Procurement and Construction Management (EPCM) Oil and...