Tank Construction Repairs and Coatings
Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program with input from the DLA SRM Group. The initial statement of work included base repairs and upgrades to each tank to comply with current UFC 3-460-01 and AST Standards where they applied. As each tank was inspected, the scope was revised to include additional repairs needed to bring the tanks into compliance.
Repair work completed under the Task Order includes:
- Tank bottom replacement
- Cathodic Protection installation
- Installation of flexible membrane liners for secondary containment
- Installation of high/low level alarms
- Tank coatings and linings
Related Projects
Related News
Pond hires Doug Swift as new quality control director for construction division
Pond is proud to announce and welcome Doug Swift as quality control director for its construction division. Transferring from his senior leadership position in the U.S. Air Force, Swift brings to the Pond corporate office more than 25 years of demonstrated excellence,...
Midlands Technical College Advanced Manufacturing and Skilled Crafts Center Showcased in Learning by Design
The Midlands Technical College Advanced Manufacturing and Skilled Crafts Center (AMSCC), completed in Fall 2015, is serving the industrial trade program and its participants as the new school year kicks into gear. The Advanced Manufacturing and Skilled Crafts Center...
Pond celebrates groundbreaking at Colt Creek State Park
Pond was excited to be part of the groundbreaking ceremony for the construction of a new recreational vehicle and camping facility at Colt Creek State Park last week. Under direction of the Florida Department of Environmental Protection, Pond has completed the design...