Tank Construction Repairs and Coatings
Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program with input from the DLA SRM Group. The initial statement of work included base repairs and upgrades to each tank to comply with current UFC 3-460-01 and AST Standards where they applied. As each tank was inspected, the scope was revised to include additional repairs needed to bring the tanks into compliance.
Repair work completed under the Task Order includes:
- Tank bottom replacement
- Cathodic Protection installation
- Installation of flexible membrane liners for secondary containment
- Installation of high/low level alarms
- Tank coatings and linings
Related Projects
Related News
Pond Constructors awarded Pinnacle Park project
The City of Norcross, Georgia recently awarded a Design/Build contract to Pond Constructors to design and construct the city’s new Pinnacle Park project. Pinnacle Park will be located off Brook Hollow Parkway adjacent to Pinnacle Center Business Park, located at 250...
Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost
Pond's Bryan Schroeder, Director of Virtual Design and Construction, discusses the importance of Virtual Design and Construction (VDC) in the Fall 2017 issue of Ingenuity Magazine. Virtual Design and Construction examines VCD technology and how Building Information...
Pond celebrates safety accomplishments during project
The Pond constructors team recently celebrated its safety accomplishments while working on two new 37,000 bbl jet fuel storage tanks. Since the start of field efforts, the Pond team has worked 9,617 man-hours on the project without experiencing any injuries. While the...