Tank Construction Repairs and Coatings

Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program with input from the DLA SRM Group. The initial statement of work included base repairs and upgrades to each tank to comply with current UFC 3-460-01 and AST Standards where they applied. As each tank was inspected, the scope was revised to include additional repairs needed to bring the tanks into compliance.
Repair work completed under the Task Order includes:
- Tank bottom replacement
- Cathodic Protection installation
- Installation of flexible membrane liners for secondary containment
- Installation of high/low level alarms
- Tank coatings and linings
Related Projects
Related News
MARTA Selects Pond for On-Call Contract to Improve Infrastructure
ATLANTA – May 05, 2022 – The Metropolitan Atlanta Rapid Transit Authority (MARTA) recently awarded a multi-year on-call contract to Pond for Architectural and Engineering Consulting Services to support the design of new and existing facilities and for the upgrade or...
Julian Ramirez Promoted to Vice President of Construction Services
ATLANTA – (01.13.21) – Pond, an industry leader in construction management, architecture, engineering and planning, is proud to announce the promotion of Julian Ramirez to Vice President of Construction Services, where he will lead Pond’s construction management,...
Pond Wins ConstructSecure Platinum Safety Award!
ATLANTA – (04.23.20) – ConstructSecure awarded Pond with the Platinum Safety Award. Through a competitive review process, ConstructSecure presents this achievement to companies that register a safety score of 95% or higher. Pond exceeds the standard with an overall...