Under this Task Order, Pond Constructors performed various repairs and upgrades to petroleum tank systems at fifteen locations throughout the continental United States (CONUS). The work was performed under the direction of DLA-Energy’s Centrally Managed Program...
Pond Constructors upgraded lighting in a 509,000 square foot metal building used by Lockheed Martin facility maintenance at their Marietta, Georgia facility. The project included demolishing 2,700 fluorescent fixtures, installing over 2,400 high efficiency fluorescent...
Pond provided design/build services for this new 4-story 57,000 sf building consisting of 2+2 modules and common support areas to accommodate a maximum of 240 personnel. The architectural design provides an efficient design of stacked floor plates with shared common...
The renovation of Building D repurposes a vacant 40,000 SF warehouse to bring a consolidated location for essential student services departments on campus. The facility includes advising and testing centers, disability services, campus safety, and faculty suites all...
Pond provided design services to reconstruct existing 75’ by 4,560’ Runway 13/31 to allow for Air Force C-130s to train at the airfield. Design included: Permanently displacing threshold Widening two taxiways Replacing a transient parking apron Replacing a run-up ramp...