Bachelor Enlisted Quarters, EOD School - Eglin Air Force Base, FL

Pond provided design/build services for this new 4-story 57,000 sf building consisting of 2+2 modules and common support areas to accommodate a maximum of 240 personnel. The architectural design provides an efficient design of stacked floor plates with shared common spaces on each floor.
Other additions included new parking areas, two pavilions, and other site enhancements. Meeting the requirements of the Base ACP, each pavilion consists of a 12′ classic square shape with power, natural gas, grill, benches and trash receptacles. Incorporated into the landscaping design are berms, planters, and bollards to meet force protection requirements. The project incorporated LEED® Sustainable design standards.
Related Projects
Related News
Pond Awarded Contract to Design New Quick Start Training Center
ATLANTA, GA - (June 5, 2023) – Through a partnership with the Georgia State Financing and Investment Commission (GSFIC), the Technical College System of Georgia (TCSG), and Quick Start, Pond has been awarded a contract to provide architecture and engineering services...
Key Hires Strengthen Pond’s Higher Ed Team
ATLANTA, GA - (April 5, 2023) – Pond today announced two key hires that will further strengthen the firm’s higher education team and provide clients with unmatched experience and expertise in architecture and campus planning for colleges, universities, technical...
Pond-CDM Joint Venture Awarded $42M PACAF Task Order Contract to Provide Military Planning, Programming and Design Services
ATLANTA, GA - (February 24, 2023) — Pond along with its joint venture partner, CDM Smith, announced today it has been awarded a task order contract to support the planning and design needs of eight installations throughout the Pacific Air Forces (PACAF) Theater. Under...