Runway 8L/26R - Hartsfield-Jackson Atlanta International Airport, GA

Runway 8L/26R - Hartsfield-Jackson Atlanta International Airport, GA

As part of its on-call services, the Aviation Infrastructure Solutions (AIS) Joint Venture was tasked to design the reconstruction of Runway 8L/26R and two of its high-speed taxiways. Pond and other members of the JV team, along with Atlanta Department of Aviation...
Hangar Development and Apron Paving - Harris County Airport, GA

Hangar Development and Apron Paving - Harris County Airport, GA

In order to accommodate the growing waiting list of aircraft, the Harris County Board of Commissioners requested plans and specifications be prepared to construct one 10-unit Jumbo T-Hangar and two 100’ x 100’ corporate hangars. The project scope included improving...
Taxiway Relocation - Harris County Airport, GA

Taxiway Relocation - Harris County Airport, GA

The Pond Team was selected as the consultant for Harris County Airport just after bids were received by the County for the construction of the Taxiway Relocation, designed by another firm. The 5,000-foot full-parallel taxiway was too close to the runway and did not...
Runway 09/27 Extension - Harris County Airport, GA

Runway 09/27 Extension - Harris County Airport, GA

The Pond Team completed preliminary engineering for a 1,000- foot runway and parallel taxiway extension for the Airport’s single runway from 5,000 feet to 6,000 feet to better serve longer haul routes of jet aircraft from the region. The Airport already boasts an...
C-5 and C-130 Simulator Facilities - Lockheed Martin, Marietta, GA

C-5 and C-130 Simulator Facilities - Lockheed Martin, Marietta, GA

C-130 Simulator Relocation C-130 Simulator Relocation Pond has been involved with Lockheed Martin on multiple simulator facilities at the Lockheed Martin Aeronautics Marietta Plant for two variants of C-130 and a C-5 aircraft. These projects are currently in either...

Pin It on Pinterest