Hangar Development and Apron Paving - Harris County Airport, GA

In order to accommodate the growing waiting list of aircraft, the Harris County Board of Commissioners requested plans and specifications be prepared to construct one 10-unit Jumbo T-Hangar and two 100’ x 100’ corporate hangars. The project scope included improving the site drainage; constructing approximately 7,600 square feet of apron/taxilane expansion pavement; relocating existing and installing new electrical and water utilities; and constructing a new 2,500 linear foot access road. Critical phasing and scheduling was required to ensure the contractor met the extremely aggressive schedule required by the Commission. In addition to design services, the Pond Team performed construction administration and resident inspection services.
Related Projects
Related News
Pond Strengthens Control Tower Expertise Through Transaction with CTBX
ATLANTA, GA - (June 27, 2023) – Pond & Company (“Pond”), a market leading engineering and consulting services firm has acquired long-time partner CTBX, a Florida-based, air traffic control tower (“ATCT”) consulting firm. The shared capabilities of Pond and CTBX...
Evaluating Georgia’s Aviation System and its Need for Aircraft Storage Hangars
I recently had the opportunity to meet with the Georgia State Legislature Joint Study Committee on Airport Infrastructure and Improvements. I presented findings evaluating Georgia's current aviation infrastructure with a special focus on hangars. A clear plan for...
Huntsville International (HSV) Security Upgrade Featured in Airport Improvement
Pond designed a facility-wide security upgrade for Huntsville International Airport in Huntsville, Alabama. After performing a security threat and vulnerability assessment, Pond helped the airport develop an automated multilevel system to replace the outdated...