As part of AGL’s STRIDE II expansion program, Pond performed pre-survey assessment of corrosion and AC mitigation requirements for new transmission pipelines. Complete cathodic protection and mitigation designed followed. Related Projects Cathodic Protection...
Pond’s ICM staff performed detailed site assessments, including reviewing operation and maintenance procedures, to develop US Coast Guard and DoD compliant O&M manuals for six Defense Fuel Support Point (DFSP) sites throughout Japan and two sites in Guam....
To evaluate the condition of the pipeline and determine if replacement was necessary, Pond performed a Close Interval Survey on fuel transfer lines at the Memphis International Airport. Following completion of the survey, Pond conducted API 570 investigations. Related...
Pond performed a complete CIS/DCVG and corrosion assessment of the fuel pipelines at this air base. Confirmatory examinations were performed at all coating defect indications. Corrosion rate and lifetime expectancy were calculated to comply with German regulations....
Pond performed External Corrosion Direct Assessment (ECDA) and corrosion investigations on natural gas, fuel oil and hydrogen piping at 12 energy plants in Florida, North Carolina and South Carolina for Duke Energy. Pond performed CIS and DCVG testing on all...