The Pond Team was selected as the consultant for Harris County Airport just after bids were received by the County for the construction of the Taxiway Relocation, designed by another firm. The 5,000-foot full-parallel taxiway was too close to the runway and did not...
Pond Staff has completed several projects on this 1,143 ft. steel bascule span structure with reinforced concrete approach, which was built over the Ortega River in Jacksonville in 1906. The first project included the inspection of all concrete components and repair...
Training Aids Support Center - Fort Jackson, SC The scope of work for this Charleston District project for the 81st USAR included the preparation of a full design by Pond as Designer of Record on this D/B project with Pentacon Construction, including design drawings...
This project consists of providing enough renewable energy to improve energy resiliency and reliability, while also limiting reliance on fossil fuels. The project will include an array of solar photovoltaic panels and a wind generator. The project team worked closely...
Pond designed three separate replacement projects at VTANG Burlington, VT to address the operational needs of the 158th Fighter Wing. The current airfield facilities, facing a combination of concrete deterioration and failure along with geometrics that are not in...