State Route (SR) 6 Congestion Reduction Design - Douglas and Cobb Counties, Georgia

Pond prepared a traffic study and concept design to implement truck-friendly lanes along SR 6 (Thornton Road) in Douglas and Cobb Counties. This design will improve safety and operations from I-20 to the Whitaker Intermodal Terminal, six miles to the north, and reduce travel congestion. This project is a unique mixture of roadway widening and Intelligent Transportation System (ITS) elements to create a first of its kind, truly truck friendly corridor.

Unique Project Elements:

  • Overhead signs and pavement markings
  • Dilemma zone protection for trucks
  • Traffic responsive signal timing based on sensing mix of vehicles and adjusting for heavy truck volumes
  • Bluetooth travel time information
  • Camera monitoring with fiber optic connections to GDOT, Douglas County, and Cobb County DOT
  • Traveler information to intermodal center – NaviGAtor and overhead signage to avoid confusion with drop lanes
  • Loop ramp for I-20
  • Truck Advantage Lane defined with additional pavement/lanes

Relevant Project Highlights:

  • Corridor-wide evaluation of most efficient approach to move mixed traffic through the heavily traveled area.
  • Focused signal by signal approach to developing a corridor-wide plan for optimal operations.
  • Highly varied and specific approach to developing the best operations and traffic flow.

Related Projects

Related News

Alex Holbrook, PE, LEED AP named Principal at Pond

Alex Holbrook, PE, LEED AP named Principal at Pond

Pond is pleased to announce the appointment of Alex Holbrook as a Principal of the firm. Holbrook has served as the Building Systems Program Director at Pond for the last three years. As a LEED Accredited professional, he brings 28 years of diverse experience with the...

Pond awarded GSA Schedule 871-7 contract

Pond awarded GSA Schedule 871-7 contract

Pond was recently awarded the U.S. General Services Administration (GSA) Schedule 871-7 contract, which encompasses construction management and engineering consulting services related to real property services. The GSA 871-7 Schedule will allow Pond to create a...

Pin It on Pinterest