State Route (SR) 6 Congestion Reduction Design - Douglas and Cobb Counties, Georgia

Pond prepared a traffic study and concept design to implement truck-friendly lanes along SR 6 (Thornton Road) in Douglas and Cobb Counties. This design will improve safety and operations from I-20 to the Whitaker Intermodal Terminal, six miles to the north, and reduce travel congestion. This project is a unique mixture of roadway widening and Intelligent Transportation System (ITS) elements to create a first of its kind, truly truck friendly corridor.

Unique Project Elements:

  • Overhead signs and pavement markings
  • Dilemma zone protection for trucks
  • Traffic responsive signal timing based on sensing mix of vehicles and adjusting for heavy truck volumes
  • Bluetooth travel time information
  • Camera monitoring with fiber optic connections to GDOT, Douglas County, and Cobb County DOT
  • Traveler information to intermodal center – NaviGAtor and overhead signage to avoid confusion with drop lanes
  • Loop ramp for I-20
  • Truck Advantage Lane defined with additional pavement/lanes

Relevant Project Highlights:

  • Corridor-wide evaluation of most efficient approach to move mixed traffic through the heavily traveled area.
  • Focused signal by signal approach to developing a corridor-wide plan for optimal operations.
  • Highly varied and specific approach to developing the best operations and traffic flow.

Related Projects

Related News

Pond announces acquisition of Landmark Engineering

Pond announces acquisition of Landmark Engineering

Pond, an international engineering, architecture, planning, and construction firm headquartered in Peachtree Corners, Ga., announces the acquisition of Jacksonville, Fla.-based Landmark Engineering. With the acquisition of Landmark, Pond strengthens its Transportation...

Pond awarded Howard Midstream Energy Partners LLC contract

Pond awarded Howard Midstream Energy Partners LLC contract

Pond’s Oil & Gas group was recently awarded the design contract for Texas-based Howard Midstream Energy Partners LLC (HEP) expansion of its Port Arthur bulk liquids terminal complex. Working closely with HEP, Pond will design a new storage facility, including 15...

Pin It on Pinterest