State Route (SR) 6 Congestion Reduction Design - Douglas and Cobb Counties, Georgia

Pond prepared a traffic study and concept design to implement truck-friendly lanes along SR 6 (Thornton Road) in Douglas and Cobb Counties. This design will improve safety and operations from I-20 to the Whitaker Intermodal Terminal, six miles to the north, and reduce travel congestion. This project is a unique mixture of roadway widening and Intelligent Transportation System (ITS) elements to create a first of its kind, truly truck friendly corridor.

Unique Project Elements:

  • Overhead signs and pavement markings
  • Dilemma zone protection for trucks
  • Traffic responsive signal timing based on sensing mix of vehicles and adjusting for heavy truck volumes
  • Bluetooth travel time information
  • Camera monitoring with fiber optic connections to GDOT, Douglas County, and Cobb County DOT
  • Traveler information to intermodal center – NaviGAtor and overhead signage to avoid confusion with drop lanes
  • Loop ramp for I-20
  • Truck Advantage Lane defined with additional pavement/lanes

Relevant Project Highlights:

  • Corridor-wide evaluation of most efficient approach to move mixed traffic through the heavily traveled area.
  • Focused signal by signal approach to developing a corridor-wide plan for optimal operations.
  • Highly varied and specific approach to developing the best operations and traffic flow.

Related Projects

Related News

Teamwork and safety lead to success on repair project

Teamwork and safety lead to success on repair project

Pond and Truston recently completed a project repair on marine oil booms, floating apparatuses designed to contain any oil that might leak from a docking vessel, at Pearl Harbor Hotel Pier off the Hawaiian island of Oahu. The damage, caused by normal wear and tear,...

VIDEO: Why Work Anywhere Else?

VIDEO: Why Work Anywhere Else?

How does Pond consistently rank as a best place to work? It's because of the outgoing culture we foster, and the great people who are growing their future with us! If you’ve been searching for the opportunity to make a difference, consider joining the Pond family. Our...

Pond featured in Airport Improvement Magazine

Pond featured in Airport Improvement Magazine

Pond Aerospace Program Manager Tim Fredlund writes about the Design-Build delivery method and utilizing the process in airfield projects for the October issue of Airport Improvement Magazine. In his Industry Insider column, "Putting the Design-Build Delivery Method to...

Pin It on Pinterest