State Route (SR) 6 Congestion Reduction Design - Douglas and Cobb Counties, Georgia
Pond prepared a traffic study and concept design to implement truck-friendly lanes along SR 6 (Thornton Road) in Douglas and Cobb Counties. This design will improve safety and operations from I-20 to the Whitaker Intermodal Terminal, six miles to the north, and reduce travel congestion. This project is a unique mixture of roadway widening and Intelligent Transportation System (ITS) elements to create a first of its kind, truly truck friendly corridor.
Unique Project Elements:
- Overhead signs and pavement markings
- Dilemma zone protection for trucks
- Traffic responsive signal timing based on sensing mix of vehicles and adjusting for heavy truck volumes
- Bluetooth travel time information
- Camera monitoring with fiber optic connections to GDOT, Douglas County, and Cobb County DOT
- Traveler information to intermodal center – NaviGAtor and overhead signage to avoid confusion with drop lanes
- Loop ramp for I-20
- Truck Advantage Lane defined with additional pavement/lanes
Relevant Project Highlights:
- Corridor-wide evaluation of most efficient approach to move mixed traffic through the heavily traveled area.
- Focused signal by signal approach to developing a corridor-wide plan for optimal operations.
- Highly varied and specific approach to developing the best operations and traffic flow.
Related Projects
Related News
Pond’s Integrity and Corrosion Management Department Performs Corrosion Evaluation
Pond’s Integrity and Corrosion Management team recently performed a corrosion evaluation on coal silos for a client. Led by Senior Project Manager David Hunter and Technical Director Sasan Hosein, the team went onsite to investigate and form a solution for extending...
Pond adds Senior Project Manager Brad Jones, PLA, ASLA, to its ‘landscape’
Pond is proud to announce and welcome Brad Jones, PLA, ASLA as Senior Project Manager for the Transportation and Community Development division. Located at Pond’s headquarters, Jones, a registered Landscape Architect and Georgia Soil and Water Conservation Commission...
Raymond Pond Solutions Awarded BMO Phase II Contract
The U.S. General Services Administration (GSA) recently awarded Building Maintenance and Operations (BMO) Phase II Contracts to small business contractors in several new zones throughout the country. This BMO Best-in-Class (BIC) strategic sourcing solution promotes...