Samsung Electronics, Complex Addition - Newberry, SC
This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.
Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).
As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.
The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.
Related Projects
Related News
Pam Little Joins the Next Generation of Defense Leaders in SAME Leader Development Program
Pond is proud to announce Defense Program Manager Pam Little, PE, PMP, has been recently welcomed into the 2021- 2022 Class of SAME Leaders. SAME identifies emerging talent from within the Society to join their Leader Development program, which will equip them with...
FSB – Pond JV Selected as an Architect-Engineering Design Consultant for Air Force B21 Mission
ATLANTA – (04.02.2021) – Pond and its joint venture partner Frankfurt-Short-Bruza Associates (FSB-Pond) will support the U.S. Air Force Civil Engineer Center’s efforts to beddown its newest stealth bomber, the B-21 Raider. The shared $200 million capacity, 7-year...
Pond Recognized for Safety Success by South Carolina Chamber of Commerce
Pond, an engineering, architecture, planning and construction services firm, was honored to receive the Commendation of Excellence by the South Carolina Chamber of Commerce for our outstanding safety and health record in 2020. This is the third time Pond has received...