Samsung Electronics, Complex Addition - Newberry, SC
This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.
Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).
As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.
The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.
Related Projects
Related News
Jacksonville Regional Transportation Center Achieves LEED Gold Certification
Jacksonville Regional Transportation Center has achieved LEED Gold Certification. Pond, our joint venture partner Michael Baker, multiple subconsultants, and construction manager Balfour Beatty, are proud to have developed this landmark project for the Jacksonville...
Gina John Joins Pond as Geospatial Program Manager to Advance Technology Services
Metairie, LA - (5.13.21) – Pond, one of the country’s fastest growing architecture, engineering, and planning firms, is further strengthening its technology solutions with the addition of Gina John as Geospatial Program Manager. A leader in geospatial and asset...
NAVFAC Washington – Raymond-Pond Full-Service Solutions JV Awarded IDIQ for AE Services for Civil and Structural Services
ATLANTA – (05.03.21) – The Raymond-Pond Full-Service Solutions JV (Raymond-Pond JV), has been awarded the $30M IDIQ for AE Services for Civil and Structural Services at NAVFAC Washington’s Area of Responsibility. “This is an exciting opportunity to continue supporting...