Samsung Electronics, Complex Addition - Newberry, SC
This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.
Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).
As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.
The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.
Related Projects
Related News
Pond Named 2021 Platinum Safety Award Winner!
ATLANTA - (01.28.2021) - Pond has received the Platinum Safety Award from ConstructSecure, which recognizes companies that have a safety score of 95% or greater in their exhaustive Safety Assessment Program. In a statement released from ConstructSecure’s CEO, Garrett...
Pond Selected by the South Carolina Department of Administration as Architectural Consultant
Columbia, SC - (01.26.21) - Pond, an industry leader in architecture, engineering, construction, and planning services, was selected to serve the South Carolina Department of Administration (SCDA) in a two-year indefinite quantity contract for architectural &...
Optimizing Performance and Resiliency at Lake Sequalitchew
The aging hydraulic diversion structure at Lake Sequalitchew was in desperate need of repair after environmental concerns and maintenance issues had begun due to its dilapidated condition for continued performance....