Holcomb Bridge Road at 400 Corridor Study - Roswell, GA
Pond performed a study of the Holcomb Bridge Road / SR 400 corridor. This study examined land use and transportation needs associated with the SR 400 interchange and adjacent intersections. The study included analysis and concept development for a variety of potential solutions to enhance traffic flow along the corridor for traffic traveling through the area, to/from this section of Holcomb Bridge Road, and within the corridor and between interchange quadrants. The study considered transit, pedestrian, and bicycle travel as well as automobile travel.
The study utilized land use recommendations resulting from a detailed charrette process performed by Pond as part of the City’s Comprehensive Plan update, the results of which were coordinated with the corridor study.
Related Projects
Related News
The City of Roswell and Child Development Association break ground on Grove Way and Bush Street Intersection Realignment project
The City of Roswell and the Child Development Association (CDA) recently celebrated the groundbreaking for the Grove Way and Bush Street Intersection Realignment project. Kevin Hendrix, a project manager with Pond, was in attendance, along with representatives from...
Pond announces acquisition of Landmark Engineering
Pond, an international engineering, architecture, planning, and construction firm headquartered in Peachtree Corners, Ga., announces the acquisition of Jacksonville, Fla.-based Landmark Engineering. With the acquisition of Landmark, Pond strengthens its Transportation...
Richard Fangmann presented with the Karl Bevins Distinguished Service Award
Pond's Richard Fangmann was presented the Karl Bevins Distinguished Service Award Thursday, December 15, at the annual Georgia Section of the Institute of Transportation Engineers (ITE) meeting. Recipients of this award have demonstrated the qualities of competence,...