Samsung Electronics, Complex Addition - Newberry, SC

This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.

Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).

As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.

The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.

Related Projects

Related News

VIDEO: Why Work Anywhere Else?

VIDEO: Why Work Anywhere Else?

How does Pond consistently rank as a best place to work? It's because of the outgoing culture we foster, and the great people who are growing their future with us! If you’ve been searching for the opportunity to make a difference, consider joining the Pond family. Our...

Pond featured in Airport Improvement Magazine

Pond featured in Airport Improvement Magazine

Pond Aerospace Program Manager Tim Fredlund writes about the Design-Build delivery method and utilizing the process in airfield projects for the October issue of Airport Improvement Magazine. In his Industry Insider column, "Putting the Design-Build Delivery Method to...

Pin It on Pinterest