Samsung Electronics, Complex Addition - Newberry, SC

This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.

Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).

As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.

The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.

Related Projects

Related News

Pond announces new Senior Associates

Pond announces new Senior Associates

Pond, an industry leader in planning, architecture, engineering and construction services, is proud to recognize individuals who demonstrate extensive knowledge in their respective fields, with promotions to senior associate. These leaders embody Pond’s dedication to...

The Pittsburgh Air Reserve Station hosts ground breaking ceremony

The Pittsburgh Air Reserve Station hosts ground breaking ceremony

Pond recently attended the groundbreaking ceremony at the Pittsburgh Air Reserve Station. This ceremony kicked off the transition to the C-17 Globemaster III cargo aircraft, which is replacing the C-130 Hercules currently at the base. Several projects under three...

Pond celebrates safety accomplishments during project

Pond celebrates safety accomplishments during project

The Pond constructors team recently celebrated its safety accomplishments while working on two new 37,000 bbl jet fuel storage tanks. Since the start of field efforts, the Pond team has worked 9,617 man-hours on the project without experiencing any injuries. While the...

Pin It on Pinterest