Samsung Electronics, Complex Addition - Newberry, SC

This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.

Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).

As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.

The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.

Related Projects

Related News

Pam Little Named SAME Southeast VP

Pam Little Named SAME Southeast VP

ATLANTA – March 28, 2022 – Pond is honored to announce that Federal Program Manager Pam Little has been selected to serve as Regional Vice President (RVP) of the Southeast region of the Society of American Military Engineers (SAME). SAME builds leaders and...

Honoring African American Legacy Through Design

Honoring African American Legacy Through Design

It’s not often you start a design project and get the opportunity to delve deep into the past. Architect Jorge Mendez and Architectural Designer David Graham jumped at the chance to honor African American legacy when the US Fish & Wildlife Service hired Pond to...

Pond Ranks #1 Atlanta Engineering Firm for Second Year in a Row

Pond Ranks #1 Atlanta Engineering Firm for Second Year in a Row

ATLANTA – February 23, 2022 – Pond, a progressive, full-service engineering, architecture, and planning company, has been recognized as the area’s top engineering firm by Atlanta Business Chronicle. Pond has maintained its number 1 spot among the city’s largest firms...

Pin It on Pinterest