Samsung Electronics, Complex Addition - Newberry, SC
This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.
Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).
As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.
The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.
Related Projects
Related News
Pond Awarded $99M Contract for A-E Services for the 374th Civil Engineer Squadron, Yokota Air Base, Japan
ATLANTA – July 18, 2022 – Pond, one of the fastest-growing A-E firms in the country, has been awarded a $99 million contract to provide multi-discipline design and planning services to the 374th Civil Engineer Squadron (374th CES) at Yokota Air Base, Japan. Pond is...
Pond Announces Dave Caldwell, Colonel, U.S. Army (Ret.), as Army Client Account Manager
ATLANTA – July 14, 2022 – Pond—one of the country’s fastest growing engineering, architecture, and planning firms—is expanding its Federal practice with the addition of Dave Caldwell, Colonel (Ret.), as Army Client Account Manager. Dave joins the private sector...
Raymond-Pond Enterprise Solutions Awarded $40M Contract for A-E Services and Multi-Discipline Construction Projects to Robins AFB, GA
ATLANTA – July 13, 2022 – Pond and its joint venture partner, Raymond Engineering (Raymond-Pond), have been awarded a new $40 million indefinite-delivery/ indefinite-quantity (IDIQ) contract to provide architecture and engineering (A-E) services to the 78th Air Base...