The project included complete project management and design for 12 miles of 12” steel natural gas transmission pipeline (MAOP 720 psi) through the suburbs of the greater Atlanta area for Atlanta Gas Light. The scope included all land survey, land acquisition, design,...
Magnolia Springs Dam Auxiliary Spillway Rehabilitation - Magnolia Springs State Park, GA Pond is currently working on the rehabilitation of a new auxiliary spillway for the GADNR. The current auxiliary spillway within the park has been hydraulically undermined and...
State Park Dam Inspections and Emergency Action Plans - Various State Parks, GA Pond is currently working with the GADNR, a longtime client, performing their visual inspections for the GASDP compliance for High Hazard Dams along with a 3-D Scanned “as-condition”...
Pond has completed the hydrologic and hydraulic (H&H) assessment phase for the NRCS and GASDP (Georgia Safe Dams Program). This phase consisted of performing an updated H&H study to see if the dam meets current regulatory requirements for the NRCS and GASDP....
The Hill and Main subdivision in downtown Duluth is an 18.5 acre, 98 lot mixed single-family and townhome development. Pond designed the subdivision to tie into the existing Hill and Main streets and incorporate the City of Duluth’s plans to connect Davenport Road...