North Oconee East Campus Greenway - Athens, GA
This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.
Related Projects
Related News
Pond completes design and construction services for Lockheed Martin’s new Hercules Training Center
Pond recently completed design and construction services for Lockheed Martin’s new Hercules Training Center, a 6,500 square-foot building that houses a reconfigurable full motion simulator for C-130J and LM-100J training. The LM-100J is able to perform as a civil,...
Pond develops conceptual architectural design for the Cecil Airport
Pond’s Aviation team was pleased to develop the conceptual architectural design for the Jacksonville Aviation Authority (JAA) to replace the existing Air Traffic Control Tower (ATCT) at Cecil Airport in Jacksonville, Florida. As a subconsultant to RS&H, Pond was...
Andrew Kohr, PLA, ASLA, joins Pond as Senior Project manager serving Atlanta
ATLANTA, Georgia – (10.22.18) – Pond, an industry leader in engineering, planning, architecture, and construction services, is pleased to announce the addition of Senior Project Manager Andrew Kohr. Kohr will be based out of Pond’s downtown Atlanta office and...