North Oconee East Campus Greenway - Athens, GA
This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.
Related Projects
Related News
An Overview of LNG: Production, Power, and Pond’s Expertise
Author: Patrick Shannon, PE | Technical Director, Mechanical Engineering | patrick.shannon@pondco.com Introduction Natural gas is a fossil energy source primarily composed of methane. It’s typically transported in its gaseous state via pipeline and serves as a...
Understanding NPRM DIMP: Recordkeeping Practices, Presence of Qualified Personnel, District Regulator Stations
In early 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) proposed revisions to the pipeline safety regulations for natural gas distribution lines after the 2018 Merrimack Valley incident, which resulted in one fatality. In the following...
Pond Continues Growth in Metro Atlanta with the Opening of Third Office
ATLANTA - (March 7, 2024) – Pond, a leading architecture, engineering, planning, and construction management firm, is pleased to announce the opening of a new office located in Cobb County. Situated within the Cumberland Community Improvement District at Pennant Park...