North Oconee East Campus Greenway - Athens, GA
This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.
Related Projects
Related News
Brian Lunsford Promoted to Vice President of Asset Integrity at Pond
ATLANTA – (07.16.19) – Pond, an industry leader in engineering, construction, planning and architecture services announces the promotion of Brian Lunsford, PE to Vice President of their Asset Integrity Program. In this role, Brian will utilize his specialized...
Bob Williams Promoted to Senior Vice President of Pond’s Community Development Team
Pond, an industry leader in engineering, construction, planning and architecture services, announces the promotion of Bob Williams, PE to Senior Vice President.
Resilience, Restoration and Re-connectivity: Pond’s Environmental Experts Discuss the Growing Movement for Balancing Nature and Human Needs
Pond will be presenting in-depth discussions at the 14th Annual Georgia Environmental Conference on August 21-23, 2019. Pond Environmental Services Program Manager Stephen Bailey and Senior Project Manager Glenn Martin are leading expert panel presentations covering...