Hammerhead Barracks Renovation - Fort Benning, GA

As part of a $20M Design-Build renovation project, Pond evaluated the Hammerhead Barracks at Ft. Benning for upgrades to the building structure to comply with the current UFC for progressive collapse. After analyzing the RFP design, Pond noted that the design did not meet the current requirement. Working with the contractor and supplier, Pond designed a solution using fiberwrap around existing steel members to strengthen the system against progressive collapse and meet current UFC requirements. This fast-paced Design-Build project required close coordination with USACE Savannah personnel as well as our contractor partner throughout the design.

Related Projects

Related News

Pond Engineers and Architects to assist with Inspections

Pond Engineers and Architects to assist with Inspections

Keep your Projects Moving Forward We understand the importance of keeping your construction projects moving forward. That’s why Pond stands ready with our experienced and licensed Engineers and Architects to assist with inspections in accordance with Official Code of...

Centrifuge Research Laboratory is a Work in Progress

Centrifuge Research Laboratory is a Work in Progress

Raymond-Pond JV Helps U.S. Army Engineer Research and Development Center’s Centrifuge Research Laboratory Get Back in Operation By Matt Allinson, PMP, GGP, Col, USAF (Ret.) | Senior Project Manager | Pond The U.S. Army Engineer Research and Development Center (ERDC)...

Pin It on Pinterest