Hammerhead Barracks Renovation - Fort Benning, GA

As part of a $20M Design-Build renovation project, Pond evaluated the Hammerhead Barracks at Ft. Benning for upgrades to the building structure to comply with the current UFC for progressive collapse. After analyzing the RFP design, Pond noted that the design did not meet the current requirement. Working with the contractor and supplier, Pond designed a solution using fiberwrap around existing steel members to strengthen the system against progressive collapse and meet current UFC requirements. This fast-paced Design-Build project required close coordination with USACE Savannah personnel as well as our contractor partner throughout the design.

Related Projects

Related News

Pond honored for notable contributions to SAME

Pond honored for notable contributions to SAME

Pond was honored to be selected as the Seymour S. Greenfield Sustaining Member Award winner for 2017. Senior Project Manager Pam Little joined Executive Vice President John Cassidy, Vice President Mike Magahey, Program Manager George Fragulis, Program Manager Steve...

Pin It on Pinterest