Widening of SR 17 - Franklin County, GA

This project included the design for the widening of approximately 4 miles of SR 17 from the Stephens County line to I-85. The project included realignment and improvements to the intersections at the I-85 interchange ramps as well as a new intersection at the proposed Lavonia By-Pass. The proposed improvements include widening to a four lane rural roadway with a 44’ depressed grassed median for a majority of the improved roadway. The existing bridge over I-85 was widened and raised. An extensive part of the widening design included coordination with the existing railroad adjacent which runs parallel to the roadway. The design also included the development of an extensive storm drainage system and modifications to the I-85 ramps. The proposed widening provides a four lane section with both urban and depressed grass medians. Pond managed the preparation of an Environmental Assessment and all related environmental special studies. Key environmental tasks included: waters delineation & permitting; protected species evaluation; air & noise analysis; cultural resources; Section 4(f) evaluation; and environmental justice.

Related Projects

Related News

Pond’s Mableton Town Square in Cobb County garners design award

Pond’s Mableton Town Square in Cobb County garners design award

Pond was recently selected by the American Council of Engineering Companies of Georgia (ACEC Georgia) and the Georgia Department of Transportation (GDOT) as the winner of the Georgia Partnership for Transportation Quality (GPTQ) award for the work done on the Mableton...

Complete Streets Enhancing Suburban Life

Complete Streets Enhancing Suburban Life

Urban hubs across the country have proudly proclaimed their allegiance to “Complete Streets,” supposed metaphorical honey for young, affluent millennials as they flock to downtowns nationwide. In contrast to traditional streets and roadways, which are predominantly...

Pin It on Pinterest