Fuel Farm Enhancements - Hartsfield-Jackson Atlanta International Airport, GA

Pond provided complete design and construction management services on the expansion of the ATLECON Fuel Facility at Hartsfield-Jackson Atlanta International Airport. The expansion was necessary to satisfy the anticipated increase in fuel demand from the construction of the new International Concourse.

The scope included:

  • Adding a new 800 GPM inbound filtration bank to increase the maximum receipt rate from either Colonial Pipeline or Plantation Pipeline. This extended the maximum receipt rate and provided some redundancy to reduce the risk of supply interruption or reductions due to filtration issues.
  • Construction of two new 50,000 barrel above ground storage tanks with expanded spill containment. This more than doubled the capacity of the facility.
  • Addition of two new hydrant pump and filter separator sets to the existing systems, which provides the ability to issue up to 10,000 gallons per minute to the hydrant system.

The design and planning effort had to maximize the storage capacity in a limited site footprint, bounded by active taxiways, an engine run-up facility and airport service roads. The construction phasing plan allowed the existing operation to remain in service with minimal interruptions. In addition, the entire project schedule was compressed to allow the new systems to be fully operational in advance of the completion of the new International Concourse.

Related Projects

Related News

Pond continues success at Chicago O’Hare International Airport

Pond continues success at Chicago O’Hare International Airport

Pond has been hard at work for the O’Hare Fuel Committee (OFC) on the design and installation of new fuel transmission mains at Chicago O’Hare International Airport. The O'Hare Fuel System Improvement Program (FSIP) is part of the O’Hare Modernization Program (OMP),...

Pond celebrates safety accomplishments during project

Pond celebrates safety accomplishments during project

The Pond constructors team recently celebrated its safety accomplishments while working on two new 37,000 bbl jet fuel storage tanks. Since the start of field efforts, the Pond team has worked 9,617 man-hours on the project without experiencing any injuries. While the...

Pond provides quick response to BWI cargo tank farm repairs

Pond provides quick response to BWI cargo tank farm repairs

Pond recently performed an emergency response to reactivate a moth ball fuel system at Baltimore/ Washington International Thurgood Marshall Airport (BWI Marshall) for a new cargo carrier at its midfield facility. Pond performed quick turnaround as a REG system needed...