Apron, Taxiway & Hydrant System - Tennessee Air National Guard, Knoxville, TN

Pond provided full architecture, engineering and construction phase services to complete this $16 million project which included a new Air Force Type III hydrant fueling system, aircraft parking apron, entry/exit taxiways, Petroleum, Oil & Lubricant (POL) fueling complex, utilities and base perimeter roads for eight KC-135 aircraft.

Pond provided complete Type A, B and C services (concept, full design and construction administration) for the project which included:

Airfield, Apron and Taxiways

  • 88,000 SY apron and taxiways.
  • Apron and taxiway lighting.
  • Construction phasing required to maintain operations during construction.
  • Major earthwork and grading (approx. 500,000 CY of fill and embankment).

New Type III Hydrant Fueling System

  • Eight (up to 12) Hydrant Fueling System.
  • 1800 GPM (expandable to 2400 GPM) pump house.
  • Upgraded offload and fill stands.
  • New suction and fill piping.
  • Abandoned 8000 LF transfer line.

Site Civil

  • Relocated over a mile of base perimeter road (45 MPH design speed) and bridge.
  • New 10” water supply line along new road.
  • New electrical and communication lines along new road.
  • Drainage and all other utilities.
  • Department of Defense Anti-Terrorism/Force Protection compliant.

Related Projects

Related News

The 104th Fighter Wing F-15’s Get a Newly Renovated Home

The 104th Fighter Wing F-15’s Get a Newly Renovated Home

WESTFIELD, MASS. - (3.9.18) - More than a hundred attendees joined Senator Elizabeth Warren, Congressman Richard Neil, Governor Charlie Baker, and Major General Gary W. Keefe for the 104th Fighter Wing’s main hangar renovation ribbon cutting at Barnes Air National...

Pond continues success at Chicago O’Hare International Airport

Pond continues success at Chicago O’Hare International Airport

Pond has been hard at work for the O’Hare Fuel Committee (OFC) on the design and installation of new fuel transmission mains at Chicago O’Hare International Airport. The O'Hare Fuel System Improvement Program (FSIP) is part of the O’Hare Modernization Program (OMP),...

Pond celebrates safety accomplishments during project

Pond celebrates safety accomplishments during project

The Pond constructors team recently celebrated its safety accomplishments while working on two new 37,000 bbl jet fuel storage tanks. Since the start of field efforts, the Pond team has worked 9,617 man-hours on the project without experiencing any injuries. While the...

Pin It on Pinterest