7th Special Forces Group Master Planning - Eglin Air Force Base, FL
Forces Group (SFG) from Ft. Bragg, North Carolina to Eglin AFB, Florida.
The process involved a detailed study and interviews of 7th SFG members at Ft. Bragg followed by two on-site design charrettes, to analyze multiple sites at Eglin AFB and adjacent Duke Field. In addition to providing studies, narrative and graphic solutions for the project sites and buildings, the Pond team provided parametric cost estimates incorporating changes in bidding climate as a result of construction price increases caused by hurricanes Katrina and Rita. The effort also included numerous briefings to high-level decision makers with the Army and Air Force.
Following development of the Master Plan, Pond conducted building specific planning charrettes and prepared customer concept document (CCD) designs for 20 facilities, which comprised the complex, utilizing 5 teams. Project types ranged from administration facilities, headquarters and operational facilities to indoor firing ranges and training facilities, including Battalion HQ/Co Ops (120,000 sf), Group HQ (68,000 sf), Group Support Battalion (75,000 sf) and the Maritime Ops Facility (17,000 sf).
Under subcontract to HCDI, Pond subsequently provided 100% electrical, mechanical and structural engineering design services for multiple new facilities associated with this BRAC Relocation.
The facilities Pond provided 100% Engineering Support Design Services were:
- Four Battalion Headquarters/Company Operations buildings
- Three Tactical Equipment Maintenance Facilities (TEMF)
- Three oil storage buildings (POL)
- Three Organizational Equipment Buildings (OEB)
- One Maritime Operations facility
- One Classified Operations/Deployment Storage facility
Pond also provided engineering support during construction on these facilities, including RFI and shop drawing support, as well as construction observation visits.
Related Projects
Related News
FSB – Pond JV Selected as an Architect-Engineering Design Consultant for Air Force B21 Mission
ATLANTA – (04.02.2021) – Pond and its joint venture partner Frankfurt-Short-Bruza Associates (FSB-Pond) will support the U.S. Air Force Civil Engineer Center’s efforts to beddown its newest stealth bomber, the B-21 Raider. The shared $200 million capacity, 7-year...
Pond-CDM Smith JV awarded the Air Force Civil Engineer Center’s $2B AE Next Pool 4 Worldwide Facilities and Infrastructure Contract
ATLANTA – (03.08.2021) – The Pond-CDM Smith Joint Venture LP (Pond-CDM Smith) has been awarded the AE Next Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Architect-Engineer (A-E) Services by the Air Force Civil Engineer...
Colonel Robert Ruch Joins Pond as Executive Vice President
ATLANTA – (9.25.20) – Pond welcomes Bob Ruch, US Army Colonel (retired) as Executive Vice President for Defense and Federal. With over 30 years of military experience and leadership, he will oversee Pond’s support to the Army, Navy, Air Force, and National Guard as...