Ronald Reagan Boulevard Extension - Forsyth County, GA
This SPLOST-funded County project consisted of a four-mile new alignment roadway, including a four-lane divided urban roadway with raised median and multi-use path. This segment will move in excess of 35,000 vehicles per day in the design year, and represents the final leg of Ronald Reagan Boulevard, completing a 16-mile corridor that stretches from Alpharetta to Cumming, paralleling GA 400. The project included a new bridge over Big Creek, extensive retaining walls, and a multi-million dollar wetland mitigation. New and modified traffic signals were included, as well as adjustments to the adjacent Big Creek Greenway. Extensive coordination with the US Army Corps of Engineers (COE) was performed, and multiple revisions to the alignment were made to minimize ecological impacts prior to receiving approval on an Alternatives Analysis. The project also included stakeholder involvement, survey, environmental services, and design.
Related Projects
Related News
Pond Appoints New Vice President for Aviation Program
Pond, an industry leader in engineering, architecture, planning, and construction management services, has hired Thomas Wilson as Vice President of the firm’s aviation group. In his role, Wilson will lead strategic oversight of the firm’s aviation program, including...
Optimizing Aviation and Aerospace Resiliency with Boeing’s New MRO Facility
Author: Eduardo Ponce | Architect | eduardo.ponce@pondco.com In 2020, Pond was selected by the Jacksonville Aviation Authority (JAA) to design and develop an 8-bay maintenance, repair and overhaul (MRO) facility at Cecil Airport on behalf of the Boeing Company and...
A Look into the SS4A Program and How Pond Can Help
Author:Wade Carroll, AICP| Director of Community and Transportation Planning | wade.carroll@pondco.com Introduction In 2021, the Bipartisan Infrastructure Law (BIL) established the Safe Streets and Roads for All (SS4A) discretionary program to prevent roadway deaths...