Renewable Energy Project - Tidewater Community College, Virginia Beach, VA
Tidewater Community College has received a grant from the Virginia Department of Mines and Minerals and Energy to install Photovoltaic solar systems on the roof of the George Pass Building at the Chesapeake Campus. The Installation will be utilized to provide academic course work and hands on Photovoltaic installation training in conjunction with required jobs in Virginia’s growing solar industry.
This project consisted of Photovoltaic systems that would generate 50kw of energy, half of the panels provided will be monocrystalline PV Panels which are the most common type of PV panel used today. The other half of the installation will use newer lightweight thin-film “Copper Indium Gallium Diselenide“ PV Panels which offer the benefit of lighter weight and easier installation.
Pond provided necessary engineering services for design of the project in conjunction with preparation of working drawings, submittals to BCOM and presentations to the Virginia Arts and Architectural Review Board. Pond provided assistance with bidding of the project and will provide construction administration services and observation during the construction phase of the project.
Design evaluation for other Photovoltaic materials were considered in addition to monocrystalline and the Copper Indium Gallium Diselenide silicon, included: polycrystalline silicon, amorphous silicon, cadmium telluride, copper indium selenide/sulfide and Dye Sensitized solar cells for the proposed Photovoltaic system. Also included was the evaluation of the structural capacity of the existing roofing system to support the flat panel and horizontal cylindrical tube panels, pedestrian loads and associated wind loadings.
Pond developed preliminary estimates of cost that included state and federal tax credits, to determine net system costs based upon depreciation value accelerated to present worth. The approximate system installed cost is $8.00 per watt. The life cycle payback on these systems occurs at 5.8 years.
Related Projects
Related News
Maintain Building Reliability with Less Capital Outlay
Over the Memorial Day weekend, Pond & Company participated in the 2014 Georgia Association of Physical Plant Administrators (GAPPA) conference. Mark Levine, AIA, Van Lynn, PE and Mr. Frank Covington, Associate VP of Facilities at Georgia Gwinnett College...
Impacting a Community Vision: Aviation Cultural Center Design
Paul Monardo, AIA was a recent guest on The Might Five Conversations to discuss “A Closer Look at the Design Process Related to the Aviation Community & Cultural Center.” Pond is providing design services for this facility located on the grounds of Fulton County...
Building a Better Community – One Home at a Time
Jim Turner, an aviation engineer at Pond, can do just about any type of home repair or installation—put a roof on a house, fix plumbing issues, install an HVAC unit, and even do electrical work. Unfortunately he lives in an apartment where management won’t let him fix...