North Oconee East Campus Greenway - Athens, GA

 

This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.

Related Projects

Related News

Colonel Robert Ruch Joins Pond as Executive Vice President

Colonel Robert Ruch Joins Pond as Executive Vice President

ATLANTA – (9.25.20) – Pond welcomes Bob Ruch, US Army Colonel (retired) as Executive Vice President for Defense and Federal. With over 30 years of military experience and leadership, he will oversee Pond’s support to the Army, Navy, Air Force, and National Guard as...

Pond Featured in CoatingsPro Magazine

Pond Featured in CoatingsPro Magazine

Pond’s David Hunter was featured in the September 2020 Edition of CoatingsPro Magazine, where he shares a case study on a coatings failure. To read his article, “The Case of the Discolored Animal Shelter Floor,” visit their website here.

Pond Safety Success: Naval Air Station Patuxent River, Maryland

Pond Safety Success: Naval Air Station Patuxent River, Maryland

A spotless safety record is an expectation for every Pond project. We are proud to uphold rigorous regulatory standards and give our clients a peace of mind. Part of our safety culture includes recognizing when our teams go above and beyond. Here is an example of a...

Pin It on Pinterest