FAA Arc Flash Studies - Guam

The Guam site consisted of 218 points of interest, and a week on-site. The building model consisted of six scenarios involving two generators, two separate UPS, and transfer switches located at each individual critical panel. The facility is fed with a 1,000A, 480V feed that is split into two separate feeders, A and B, for redundancy. In addition there are two 750kVA generators to back up the facility for complete redundancy. Due to the nature of this facility shutting off power for the data collection, a portion of the project was not allowed, and certain critical panel we were required to open during the night shift while air traffic was low. All switch boards, panels, circuit breakers and disconnects were opened while live and data was collected. Pond did remove the covers, and though the team did not enter the electrical can, all site data was for observation only. Due to the location, Pond employees were required to travel a couple of days prior to the start of the site visit in order to ensure safety while on site.

Related Projects

Related News

Pond Project Featured in Airport Improvement

Pond Project Featured in Airport Improvement

Pond was featured in the March | April issue of Airport Improvement Magazine for the $35 million 8L-26R Runway Pavement Replacement project at Hartsfield-Jackson Atlanta International Airport. Airport Improvement Magazine, a top industry magazine with subscribers...

Impacting a Community Vision:  Aviation Cultural Center Design

Impacting a Community Vision: Aviation Cultural Center Design

Paul Monardo, AIA was a recent guest on The Might Five Conversations to discuss “A Closer Look at the Design Process Related to the Aviation Community & Cultural Center.” Pond is providing design services for this facility located on the grounds of Fulton County...

Pin It on Pinterest