Energy Program & Design Reviews of Systems - Nationwide
Pond provided comprehensive surveys, analysis and reports to identify conservative measures (ECM’s). We utilized DOS-2 and BLCC software to evaluate building envelope, HVAC systems, lighting, water heating, renewable and advanced energy systems including ice storage. Other initiatives included mechanical and electrical design reviews of both new construction and major renovations with emphasis on life cycle costs. Energy surveys included:
- Monrovia, Liberia
– 29 Buildings (133,100 SF)
– $356,000/year savings
- Stockholm, Sweden
– 59 Buildings (125,900 SF)
– $53,000/year savings
- Santiago, Chile
– 67 Buildings (155,321 SF)
– $91,000/year savings
- Montevideo, Uruguay
– 32 Buildings (184,466 SF)
– $78,000/year savings
Pond provided technical review of mechanical and electrical design with a focus on maintenance and life-cycle costs.
Related Projects
Related News
Runway Repair Innovation Gains Pond Industry Accolades
The 8L/26R Pavement Replacement Project receives an ACEC Merit Award thanks to excellent teamwork. The project to resurface the northernmost runway at Hartsfield-Jackson Atlanta International Airport (H-JAIA) was recently completed in a remarkable 29 days, thanks to...
Pond & Company Receives Honor Award and Saves Client Millions In the Process
Pond & Company received an honor award from the American Council of Engineering Companies (ACEC) of Virginia for the Daytona State College Thermal Storage Tank project. Pond was instrumental in assisting Daytona State College meet their original chilled water...
Master planning open space and green infrastructure for Gwinnett Place
Pond is developing a "Multi-Modal Green Corridor Master Plan" for the Gwinnett Place Mall area revitalization in Gwinnett County, Georgia. This work is building upon the 2012 Livable Centers Initiative plan, that will revitalize acres of under utilized parking and...