FedEx West Ramp Hydrant System - Memphis International Airport, TN
Pond provided design and construction administration services including isolation valve pits, a new pipeline to connect the new 24” fuel supply lines to the existing hydrant loop piping located under the parking ramp, motor actuators and associated controls for system isolation and localization, emergency fuel shut off system (EFSO), hydrant control valves, and pneumatic equipment connections in each of the 27 on-apron hydrant pits. Several provisions were made for adaptability for future expansion of the hydrant fuel system, control system and EFSO systems.
Related Projects
Related News
GSI-Pond JV, LLC, Awarded NAVFAC EXWC Task Order for Defense Fuel Support Point Guam
ATLANTA, GA - (May 16, 2023) – Pond and joint-venture (JV) partner, GSI, today announced the award of a Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) Task Order for Defense Fuel Support Guam. Under the $11.7M fixed-price task order, the...
Bryan Evans Promoted to Senior Vice President of Pond’s Energy Division
ATLANTA – (8.27.18) – Pond, an industry leader in engineering, planning, architecture, and construction management announced the promotion of Bryan Evans to Senior Vice President of Pond’s Energy Division. In his expanded role, Evans will lead the Energy Group...
Pond’s Culture Builds Basis for Success
[As featured in ENR Magazine April 30, 2018 Edition] Nearly 50 years after the firm started as a home-based business in 1965, engineering and planning firm Pond decided it was time to grow—by rapidly expanding its workforce. With engineering talent in high demand...