FedEx West Ramp Hydrant System - Memphis International Airport, TN

Pond provided design and construction administration services including isolation valve pits, a new pipeline to connect the new 24” fuel supply lines to the existing hydrant loop piping located under the parking ramp, motor actuators and associated controls for system isolation and localization, emergency fuel shut off system (EFSO), hydrant control valves, and pneumatic equipment connections in each of the 27 on-apron hydrant pits. Several provisions were made for adaptability for future expansion of the hydrant fuel system, control system and EFSO systems.

Related Projects

Related News

Strengthening Japan’s Fishing Economy through Fueling Engineering

Strengthening Japan’s Fishing Economy through Fueling Engineering

With 32 military bases in Okinawa, Japan, and the need for fuel for military ships and aircraft, the U.S. Defense Logistics Agency (DLA), Government of Japan (GOJ) and Pond are working together to provide a solution that will save costs, time, allow larger ships to...

Kris Allegood, PE Named Vice President of Aviation Fueling

Kris Allegood, PE Named Vice President of Aviation Fueling

Pond, an industry leader in planning, architecture, engineering and construction services, is announcing the promotion of Kris Allegood to the position of vice president. Kris is primarily responsibe for Pond’s Aviation Fueling division. He has been tasked with...

Pin It on Pinterest