Student Center Commissioning Services - Tidewater Community College, Virginia Beach, VA
The Virginia Beach Student Center is a three story, 89,500 square-foot facility actually built over top of a man-made water feature (storm water management pond). The first floor houses a dining facility, bookstore and child care areas. The second houses basketball court, fitness center, shower rooms, gaming lounge, multi-purpose rooms, and student lounge. The third floor houses meeting rooms, student lounge, multi-use conference center, and mechanical room. All floors include auxiliary spaces such as janitor closets, stairs, electrical rooms, toilets including handicap.
The mechanical system is variable-air volume (VAV) systems serving single duct terminal units with hydronic reheat coils. Each air handling unit includes an enthalpy wheel to reduce sensible and latent loads during heating and cooling operation. In addition, the units equipped with enthalpy wheels would have inline exhaust fans associated with each unit. Air handling units include economizer operation. Medium-pressure ductwork from the air-handling units serve each terminal unit. Low-pressure ductwork from each terminal unit serve ceiling diffusers and wall/ceiling grilles. The above-ceiling space is used as a return air plenum. A supplemental heating system in the form of perimeter pedestal-mounted fin-tube radiation is provided to offset perimeter heat loss.
Chilled water is generated by two air-cooled rotary screw chiller with each chiller sized for 100% of the block cooling load. Chilled water coils in the air handling units are served by two variable-speed pumps in a variable-primary pumping arrangement. Two gas-fired, condensing type boilers provide hot water for the building. Hot water coils in the air handling units and the reheat coils in the terminal units will be served by two variable-speed pumps in a variable-primary pumping arrangement.
A central building automation system allows control of the mechanical systems locally and remotely through the existing college network. The control system includes monitoring of the electrical lighting and power systems as well as extensive data collection, archiving and trending in order to comply with LEED requirements for measurement and verification of system performance.
The commissioning on this project is both LEED Fundamental and Enhanced and includes the HVAC systems, controls, domestic hot water system, and lighting controls.
Related Projects
Related News
Pam Little Named SAME Southeast VP
ATLANTA – March 28, 2022 – Pond is honored to announce that Federal Program Manager Pam Little has been selected to serve as Regional Vice President (RVP) of the Southeast region of the Society of American Military Engineers (SAME). SAME builds leaders and...
Honoring African American Legacy Through Design
It’s not often you start a design project and get the opportunity to delve deep into the past. Architect Jorge Mendez and Architectural Designer David Graham jumped at the chance to honor African American legacy when the US Fish & Wildlife Service hired Pond to...
Pond Ranks #1 Atlanta Engineering Firm for Second Year in a Row
ATLANTA – February 23, 2022 – Pond, a progressive, full-service engineering, architecture, and planning company, has been recognized as the area’s top engineering firm by Atlanta Business Chronicle. Pond has maintained its number 1 spot among the city’s largest firms...