Samsung Electronics, Complex Addition - Newberry, SC
This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.
Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).
As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.
The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.
Related Projects
Related News
Resilience, Restoration and Re-connectivity: Pond’s Environmental Experts Discuss the Growing Movement for Balancing Nature and Human Needs
Pond will be presenting in-depth discussions at the 14th Annual Georgia Environmental Conference on August 21-23, 2019. Pond Environmental Services Program Manager Stephen Bailey and Senior Project Manager Glenn Martin are leading expert panel presentations covering...
Pond Keeps Moving Up the Rankings of Best Design Firm!
ATLANTA – (05.28.19) Engineering News Record (ENR) recently published the annual listing of the Top 500 Design & Engineering Firms, and Atlanta-headquartered Pond was ranked #107! Within the last three years, Pond has moved up 123 spots on this list of highly...
Lorraine Santana White Appointed to AIA Greater Columbia Board of Directors
COLUMBIA, South Carolina – (03.15.19) – Pond, an industry leader in architecture, engineering, planning and construction services, is pleased to announce that Lorraine Santana White has been appointed to the Board of Directors for the American Institute of Architects...