Samsung Electronics, Complex Addition - Newberry, SC

This $30M building is the third facility for Samsung Electronics appliance manufacturing campus in Newberry, SC. Design aspects including warehousing, racking, ESFR fire suppression, QC labs, receiving and shipping bays. Three heated mix tanks serve two process lines with a third future process line planned. A caustic tank mixture is used in the injection molding process. The process design provides for non-reactive materials and the TPE fusion off gassing is managed by controlled exhaust.

Samsung Home Appliance America contracted with Pond to design and build a 340,000 SF warehouse addition (Complex-3) connecting two of their previously constructed complexes. Complex-3 is a storage and production integration facility designed to through-put their existing plastic extrusion plant components (Complex-2) and incoming raw materials for staged integration into their existing production facility (Complex-1).

As part of the construction effort was an existing county roadway, including underground utilities, and a non-related manufacturing facility requiring complete demolition and disposal. To prevent business interruption to ongoing operations, Pond provided new temporary loading dock facilities to replace those lost to the new connecting portion of the Complex. A very aggressive schedule was placed on this effort providing a total duration of 7 months for design and construction.

The ability to collaborate entirely in-house between design and construction has allowed Pond to design, permit and construct the project on time.

Related Projects

Related News

Innovations in Airport Runway Replacement

Innovations in Airport Runway Replacement

Minimizing construction costs for Atlanta Hartsfield-Jackson International Airport and reducing disruption to passengers, The abbreviated runway replacement schedule translated directly into cost savings for the airport’s carriers. And such costs add up quickly....

Kris Allegood, PE Named Vice President of Aviation Fueling

Kris Allegood, PE Named Vice President of Aviation Fueling

Pond, an industry leader in planning, architecture, engineering and construction services, is announcing the promotion of Kris Allegood to the position of vice president. Kris is primarily responsibe for Pond’s Aviation Fueling division. He has been tasked with...

Pond Recognizes Parks and Recreation Month with Matt Wilder

Pond Recognizes Parks and Recreation Month with Matt Wilder

Did you know that July is Parks and Recreation month? Did you know it’s been celebrated for 30 years? We’re lucky to have Matt Wilder, ASLA, LEED AP BD+C, Director of our Landscape Architecture group, to champion Parks and Recreation here at Pond.  He takes his...

Pin It on Pinterest