Renewable Energy Project - Tidewater Community College, Virginia Beach, VA

Tidewater Community College has received a grant from the Virginia Department of Mines and Minerals and Energy to install Photovoltaic solar systems on the roof of the George Pass Building at the Chesapeake Campus. The Installation will be utilized to provide academic course work and hands on Photovoltaic installation training in conjunction with required jobs in Virginia’s growing solar industry.

This project consisted of Photovoltaic systems that would generate 50kw of energy, half of the panels provided will be monocrystalline PV Panels which are the most common type of PV panel used today. The other half of the installation will use newer lightweight thin-film “Copper Indium Gallium Diselenide“ PV Panels which offer the benefit of lighter weight and easier installation.

Pond provided necessary engineering services for design of the project in conjunction with preparation of working drawings, submittals to BCOM and presentations to the Virginia Arts and Architectural Review Board.  Pond provided assistance with bidding of the project and will provide construction administration services and observation during the construction phase of the project.

Design evaluation for other Photovoltaic materials were considered in addition to monocrystalline and the Copper Indium Gallium Diselenide silicon, included: polycrystalline silicon, amorphous silicon, cadmium telluride, copper indium selenide/sulfide and Dye Sensitized solar cells for the proposed Photovoltaic system.  Also included was the evaluation of the structural capacity of the existing roofing system to support the flat panel and horizontal cylindrical tube panels, pedestrian loads and associated wind loadings.

Pond developed preliminary estimates of cost that included state and federal tax credits, to determine net system costs based upon depreciation value accelerated to present worth. The approximate system installed cost is $8.00 per watt. The life cycle payback on these systems occurs at 5.8 years.

Related Projects

Related News

Alex Holbrook, PE, LEED AP named Principal at Pond

Alex Holbrook, PE, LEED AP named Principal at Pond

Pond is pleased to announce the appointment of Alex Holbrook as a Principal of the firm. Holbrook has served as the Building Systems Program Director at Pond for the last three years. As a LEED Accredited professional, he brings 28 years of diverse experience with the...

Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost

Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost

Pond's Bryan Schroeder, Director of Virtual Design and Construction, discusses the importance of Virtual Design and Construction (VDC) in the Fall 2017 issue of Ingenuity Magazine. Virtual Design and Construction examines VCD technology and how Building Information...

Pin It on Pinterest