Berckmans Road Widening and Realignment - Augusta, GA

This project consisted of the widening and realignment of Berckmans Road, and also included a roundabout at the intersection of Berckmans Road and Ingleside. The proposed roundabout was designed as a single-lane roundabout with a westbound bypass lane just south of the bridge over Raes Creek. The design of the roundabout addressed unique challenges. These challenges included locating the proposed roundabout enough to the south to minimize impacts to Raes Creek and not interfere with the bridge design. The roundabout design took into consideration the existing approaches of Ingleside and Willow Ridge which are aligned to the south and posed a speed management challenge. As this was a TIA project, a TIA concept report, including conceptual plans and a conceptual cost estimate was prepared. Phase 1 of this project was completed in April 2016 and included the installation of the new roadway alignment section, including the installation of an 8’ sidewalk, drainage facilities, signal upgrades at two signals, and three pedestrian tunnels. Given the large amount of utilities that needed to be rerouted, a utility corridor, in which each utility had an assigned offset from the edge of the roadway, was installed along the west side of the project. This required extensive coordination with the utility providers, but expedited the utility installations during construction and ensures less utility headaches in the future.

Related Projects

Related News

Pond announces acquisition of Landmark Engineering

Pond announces acquisition of Landmark Engineering

Pond, an international engineering, architecture, planning, and construction firm headquartered in Peachtree Corners, Ga., announces the acquisition of Jacksonville, Fla.-based Landmark Engineering. With the acquisition of Landmark, Pond strengthens its Transportation...

Harris County Airport taxiway project completed under budget

Harris County Airport taxiway project completed under budget

Harris County Airport, located in Pine Mountain, Georgia, recently contracted with Pond to complete a project to relocate the primary taxiway to meet the runway centerline to taxiway centerline separation for Airplane Design Group II. The airport had to remain...

Pin It on Pinterest