Alter/Repair Runway - International Airport/AFB, Charleston, SC
Pond provided electrical engineering design services for the replacement of the visual air navigation facilities for Runway 03-21
Specific design elements:
- ALSF-1 approach lighting system utilizing low impact resistant fiberglass structures
- REIL Lighting on both Runway 03 & 21
- Edge lighting utilizing High Intensity Runway Edge Lighting (HIRL) including threshold and end lighting
- Distance markers
- Taxiway edge lighting and guidance signage
- Replacement of the existing 12-unit Visual Approach Slope Indicator (VASI) system on each end of Runway 03-21 with four-unit Precision Approach Path Indicator (PAPI) system
- Coordination with concurrent projects upgrading tower and vault lighting controls to computer-based system, replace airfield vault with new vault, and replacement of several tanks
Related Projects
Related News
Pond and FSB begin design of first fuel cell hangar for B-21 aircraft
ATLANTA – (10.21.21) – Pond, one of the fastest growing architecture and engineering firms in the country, and its joint venture partner Frankfurt-Short-Bruza Associates (FSB-Pond JV) was awarded its first task order to support the U.S. Air Force of its newest stealth...
Pond wins $2B Contract to Improve U.S. Air Force Infrastructure Worldwide
ATLANTA – (10.05.2021) – Pond, one of the fastest growing A/E firms in the country, has been awarded a $2 billion pool contract by the U.S. Air Force Civil Engineer Center (AFCEC) to improve infrastructure at airfields around the world. The AE Next...
NAVFAC Washington – Raymond-Pond Full-Service Solutions JV Awarded IDIQ for AE Services for Civil and Structural Services
ATLANTA – (05.03.21) – The Raymond-Pond Full-Service Solutions JV (Raymond-Pond JV), has been awarded the $30M IDIQ for AE Services for Civil and Structural Services at NAVFAC Washington’s Area of Responsibility. “This is an exciting opportunity to continue supporting...