Underground Storage Tank Repairs - Davis-Monthan Air Force Base, Tucson, AZ

Pond performed design, repair and construction of military fuel distribution and storage systems through a Master Services Agreement with IT Corporation. Projects included required tank repairs and installation of new high and low level control switches in the existing 19 underground JP-8 storage tanks at three facilities (pumphouses); 202 (five tanks), 206 (nine tanks) and 207 (five tanks).

 

Other type of work involved:

  • Installation of new high and low level control panels and equipment for each tank at the three storage facilities.
  • Cleaning and vapor freeing of each 19 underground fuel tanks at three pump stations, JP-8 facilities.
  • Interior epoxy coating of each 19 underground fuel tanks at three pump stations, including sand blasting and epoxy coating per standard military specifications (MIL-P-24441).
  • Tank modifications including enlarging 14 tank manways and adding additional manways.
  • Installation of new concrete pits with aluminum covers around new manways.
  • API 653 ultrasonic testing on 19 underground fuel tanks.
  • Upgrades to manual and control valving.

Related Projects

Related News

Teamwork and safety lead to success on repair project

Teamwork and safety lead to success on repair project

Pond and Truston recently completed a project repair on marine oil booms, floating apparatuses designed to contain any oil that might leak from a docking vessel, at Pearl Harbor Hotel Pier off the Hawaiian island of Oahu. The damage, caused by normal wear and tear,...

Pond provides quick response to BWI cargo tank farm repairs

Pond provides quick response to BWI cargo tank farm repairs

Pond recently performed an emergency response to reactivate a moth ball fuel system at Baltimore/ Washington International Thurgood Marshall Airport (BWI Marshall) for a new cargo carrier at its midfield facility. Pond performed quick turnaround as a REG system needed...

Pin It on Pinterest