State Route (SR) 6 Congestion Reduction Design - Douglas and Cobb Counties, Georgia

Pond prepared a traffic study and concept design to implement truck-friendly lanes along SR 6 (Thornton Road) in Douglas and Cobb Counties. This design will improve safety and operations from I-20 to the Whitaker Intermodal Terminal, six miles to the north, and reduce travel congestion. This project is a unique mixture of roadway widening and Intelligent Transportation System (ITS) elements to create a first of its kind, truly truck friendly corridor.

Unique Project Elements:

  • Overhead signs and pavement markings
  • Dilemma zone protection for trucks
  • Traffic responsive signal timing based on sensing mix of vehicles and adjusting for heavy truck volumes
  • Bluetooth travel time information
  • Camera monitoring with fiber optic connections to GDOT, Douglas County, and Cobb County DOT
  • Traveler information to intermodal center – NaviGAtor and overhead signage to avoid confusion with drop lanes
  • Loop ramp for I-20
  • Truck Advantage Lane defined with additional pavement/lanes

Relevant Project Highlights:

  • Corridor-wide evaluation of most efficient approach to move mixed traffic through the heavily traveled area.
  • Focused signal by signal approach to developing a corridor-wide plan for optimal operations.
  • Highly varied and specific approach to developing the best operations and traffic flow.

Related Projects

Related News

Engineering Georgia Magazine features Pond in talent retention article

Engineering Georgia Magazine features Pond in talent retention article

Engineering Georgia Magazine discusses the importance of talent retention, engagement and atmosphere for engineering firms in its May-June issue. In the article, Human Resources Manager Chris Scott talks Pond culture and the importance of team building. Read about it...

Pond announces new officers and executive leadership

Pond announces new officers and executive leadership

A new group of leaders were recently recognized and promoted at Pond, a progressive, full-service architecture, engineering, planning and construction firm providing quality services to government, corporate and private sector clients throughout the world. These...

The Military Engineer features “Taking Advantage of Nature”

The Military Engineer features “Taking Advantage of Nature”

Senior Electrical Engineer Clifford Daniel discusses renewable energy sources and Pond's creative solutions for utilizing them at the St. Croix Air National Guard Station in the U.S. Virgin Islands for the current issue of The Military Engineer. In the May-June issue,...

Pin It on Pinterest