North Oconee East Campus Greenway - Athens, GA
This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.
Related Projects
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Related News
Developing Emergency Action Plans
Jim Davis, Pond's Health and Safety Director, reviews the importance of developing emergency action plans in the Summer 2017 issue of Ingenuity Magazine. The article discusses potential and common emergencies such as floods, fires and toxic leaks, as well as active...
Stephen Bailey discusses ‘Clean Air & Clean Water’
In the Summer 2017 issue of Ingenuity Magazine, Program Manager Stephen Bailey talks about the importance of environmental protection during construction projects. Clean Air & Clean Water further examines the methods Pond utilizes to ensure open communication with...
Pond Takes to the Skies
In the Summer 2017 issue of Ingenuity Magazine, Pond's New Orleans branch members Sam Briuglio and Kermit Lewis discuss the implementation of Unmanned Aerial Vehicles (UAV). Read the article here and see how Pond engineers utilize this tool for various mapping,...